Assignment Prompt & Instructions
– ## RiskManagementPlanWeek2-BUSN665B001Fall2025-APEI.pdf
– ## CTDSSRiskManagementPlanv11week2BUSN665.pdf
**## RiskManagementPlanWeek2-BUSN665B001Fall2025-APEI.pdf**
Risk Management Plan Week 2
Hide Assignment Information
Turnitin™
This assignment will be submitted to Turnitin™.
Instructions
Objectives:
LO1: The student will understand the importance of risk management planning.
LO2: The student will be able to develop a Risk Management Plan.
Instructions:
Fill in the attached template for the project described below. You have limited available
information; therefore, you can make assumptions. In the "Procedures" section, be
sure to highlight the change that will be introduced in this particular project with regard
to the playground. In the "Risk Identification" section, be sure to include a discussion
on how financial risks will be identified, then further discuss these in the subsequent
sections, as appropriate.
Project Title: Building and opening a new Toy4All store
Project Description: Toy4All toy store chain wants to open a new store in a small
town. For this project, the Director of the Projects Department assigned Mr. Play as the
project manager, an employee with five years of service in the company. He will have to
plan and coordinate all activities related to the new store's opening, which, unlike other
existing stores, will be equipped with a children's playground. He will need to consider
the activities: building the store, setting up the interior and the exterior, supplying the
store with toys, defining the personnel structure, and preparing the store for the
opening. Also, the details regarding advertising must not be forgotten. The project
duration is one year and will end with an opening event.
Due to the professionalism proven when building previous stores, the company decided
to work with the same building contractor (for the construction phase). By now, all
licenses and permits required to start the work have been obtained.
The role of Mr. Play will not be easy. He was assigned due to his idea to include a
playground in the store, which, once applied, should lead to increased sales figures.
While the entire management has supported the idea, some heads of departments in
the organization were not very pleased by his assignment, considering him too young
Due on Oct 19, 2025 11:59 PM
and inexperienced for such a project. The most serious concerns are related to the
project's impact on the already planned activities that will support sales in the holiday
season.
In the Assignment dropbox, please attach your paper as a file, do not copy &
paste.
Submit your assignment by 11:59 PM ET, Day 7.
Grading Rubric
A rubric is provided for your convenience that details how this assignment will be
graded. Please review it carefully prior to submitting your work.
**## CTDSSRiskManagementPlanv11week2BUSN665.pdf**
<Project Name>
Risk Management Plan
Version X.XX
Instructions to the Author:
This is a template for developing a Risk Management Plan.
The template includes instructions to the author, boilerplate text, and fields that should be replaced with the values and
information specific to the project.
Blue italicized text enclosed in boxes provide instructions to the document author, or describes the intent, assumptions, and
context for the content included in this document. This instructional text should be removed from the final document to make
the plan more readable.
Text enclosed in angle brackets (<text>) indicates a field that should be replaced with information specific to a project.
Text in black and tables are provided as boilerplate examples of wording and formats that may be used or modified as required
to support a specific project. The information and outline is a suggestion to assist in developing project documents; they are not
mandatory formats. The author should tailor the content of the document to fit the project that this work product will support.
Risk Management is the process of identifying, analyzing, and responding to risk factors throughout the life of a project and in
the best interests of its objectives. Proper risk management implies control of possible future events and is proactive rather
than reactive.
The purpose of risk management is to
• Identify possible risks
• Reduce or allocate risks
• Provide a rational basis for better decision making about all risks
• Plan
Assessing and managing risks is the best weapon against project catastrophes. By evaluating risks and the plan for potential
problems and developing strategies to address them, you’ll improve the chances of a successful, if not, perfect project.
Additionally, continuous risk management will
• Ensure high priority risks are aggressively managed and that all risks are cost-effectively managed throughout the project
• Provide management at all levels with the information required to make informed decisions on issues critical to project
success
If you don’t actively attack risks, they will actively attack your project.
DSS Project Management recommends the DSS Risk Assessment Toolkit as the starting point for developing the project risk
management plan.
Remove this page from the final document.
<Project Name>
Risk Management Plan
Risk Management Plan Template 3
Contents
Revision History ………………………………………………………………………………………………………………………….. 3
Introduction ……………………………………………………………………………………………………………………………….. 4
Purpose ………………………………………………………………………………………………………………………………….. 4
Scope ……………………………………………………………………………………………………………………………………… 4
Roles & Responsibilities ……………………………………………………………………………………………………………….. 4
Procedures …………………………………………………………………………………………………………………………………. 5
Risk Identification ……………………………………………………………………………………………………………………. 5
Risk Analysis ……………………………………………………………………………………………………………………………. 5
Risk Response ………………………………………………………………………………………………………………………….. 5
Risk Monitoring, Controlling, and Reporting ……………………………………………………………………………….. 5
Risk Contingencies …………………………………………………………………………………………………………………… 6
Tools & Practices …………………………………………………………………………………………………………………………. 6
Risk Management Repository ……………………………………………………………………………………………………. 6
Risk Log ………………………………………………………………………………………………………………………………….. 6
References & Related Documents …………………………………………………………………………………………………. 6
Approvals …………………………………………………………………………………………………………………………………… 6
Revision History
Date Version Author(s) Notes
1/1/2018 0.01
<Project Name>
Risk Management Plan
Risk Management Plan Template 4
Introduction
Provide a brief introduction to the concept of risk management for the intended audience of this document, i.e. the project team,
project sponsor, stakeholders, and executive leadership. Reference the Risk Assessment Toolkit for appropriate content.
Remove this instruction text from the final document.
Risk Management is the process of identifying, analyzing, and responding to risk throughout the life of a
project to the best interests of its objectives.
Purpose
Define the purpose of this Risk Management Plan. Provide an overview of the strategy the project team will follow to manage
risk throughout the project life cycle. Reference the Risk Assessment Toolkit for appropriate content.
Remove this instruction text from the final document.
The purpose of the Risk Management Plan is to define how risks associated with the <PROJECT NAME>
project will be identified, analyzed, and managed. The Project Manager working with the project team
and project sponsors will ensure that risks are actively identified, analyzed, and managed throughout the
life of the project.
Scope
Define the scope of this Risk Management Plan. Provide an overview of who and what will be governed by the plan. If a supplier
is part of the engagement, explain what their responsibilities will be to this plan. Reference the Risk Assessment Toolkit for
appropriate content.
Remove this instruction text from the final document.
The scope of this document pertains to the efforts to address internal and external risks specific to the
<PROJECT NAME> project. The risk management methodology identified in this document will be used
during the entire lifecycle of the project. A supplier’s risk management methodology will be provided as
a contractual deliverable. A supplier will develop a separate Risk Management Plan and will be responsible
for managing their project risks and reporting status of those risks to the Project Manager.
Roles & Responsibilities
Provide a list of personnel and their key roles and responsibilities with respect to risk management in the project.
Remove this instruction text from the final document.
The <PROJECT MANAGER OR OTHER DESIGNEE> will serve as the risk manager for this project. The risk
management roles and responsibilities of key members of the project are listed in the table below.
Name/Title Role Risk Management Responsibility
Project Director Monitors and manages risk across multiple projects
within the DSS Project Management project portfolio.
Project Sponsor Responsible for understanding risk and signing off on
all risk mitigation plans.
Project Manager Identifies project related risk, documents project
risks, leads the effort to mitigate risk, leads the effort
to communicate project risk.
Project Team Contributes to the identification of project risks.
Assist in the mitigation of risks.
<Project Name>
Risk Management Plan
Risk Management Plan Template 5
Name/Title Role Risk Management Responsibility
Risk Assessment
Lead
Identifies initial risk assessment, gathers initial
stakeholders input related to risk.
Procedures
Provide a summary of how risk management activities will be performed, recorded, and monitored throughout the lifecycle of
the project. Reference the Risk Assessment Toolkit for appropriate content.
Remove this instruction text from the final document.
Risks will be identified as early as possible in the project to minimize their impact.
Risk Identification
Explain how project risks will be identified and typed. Reference the Risk Assessment Toolkit for details on DSS Project
Management risk identification best practices.
Remove this instruction text from the final document.
Risk Analysis
Explain how risks to the project will be analyzed. Reference the Risk Assessment Toolkit for details on DSS Project Management
risk analysis best practices.
Remove this instruction text from the final document.
Risk Response
Provide a general outline of what response strategies the project will pursue should a risk escalate into an issue. Reference the
Risk Assessment Toolkit for details on DSS Project Management risk response best practices.
Remove this instruction text from the final document.
Risk Monitoring, Controlling, and Reporting
Provide a general outline of how the project team will monitor, control, and report risks. Outline standing project procedures,
review processes, frequency of reviews, and team roles and responsibilities with respect to these tasks. Include a listing of
conditions that will trigger an escalation of a risk to the appropriate level of visibility. Reference the Risk Assessment Toolkit for
details on DSS Project Management risk monitoring, controlling and reporting best practices.
Remove this instruction text from the final document.
E.g., all active high exposure risks will be tracked and published in a weekly project status report and in
the monthly executive steering committee report. When a risk has been reviewed and is found to be in a
state of escalation to a high level of exposure, it should be added to all reports.
Escalation
Provide an overview of the escalation path for reporting new high exposure risks.
Remove this instruction text from the final document.
E.g., escalation of high exposure risks should, at minimum include in the reporting chain the
• Project Sponsor
<Project Name>
Risk Management Plan
Risk Management Plan Template 6
• Business Lead
• Steering Committee
• Program Director
Risk Contingencies
Provide a listing of contingencies the project will consider with the sponsor should a response to a critical risk fail. Reference the
DSS Project Management Risk Assessment Toolkit for details on risk contingency best practices.
Remove this instruction text from the final document.
Tools & Practices
Provide an overview of the tools the project will use and the practices the team is committed to follow to manage project risks.
At a minimum, the project must develop and maintain a risk log. This can be by using a project management tool suite for large,
complex projects or using the Risk Log Template for small projects of a short duration. Additionally, the project team should
establish a repository for collocating the plan and the artifacts that will be generated over the life cycle of the project.
Remove this instruction text from the final document.
Risk Management Repository
Detail the location (directory, system, etc.) and a high-level overview of organization structure of the Risk Management
Repository. If available provide an accessible link to the repository’s location.
Remove this instruction text from the final document.
Risk Log
Provide an outline of what (i.e. DSS Risk Log Template, risk management system, etc.) will be used to capture and track identified
risks. Provide a list of the key information items that will be captured for each risk. Detail where the Risk log will be maintained.
If available, provide an accessible link to the Risk Log’s location.
Remove this instruction text from the final document.
References & Related Documents
Provide references to any project work products this plan is dependent on or are dependent on this risk management plan. For
example, the project charter contains a listing of high-level risks and assumptions, artifacts may be created from the DSS Project
Management Risk Assessment Toolkit, the project schedule will likely include risk assessment reviews at the end of every major
iteration, etc.
Remove this instruction text from the final document.
Approvals
Identify by name, title, and signature the individuals agreeing to authorize expenditure of organizational resources to
accomplish the project activities outlined in this Risk Management Plan. At a minimum, the plan should be signed by the Project
Manager, the project sponsor, and, if applicable, the executive sponsor.
Remove this instruction text from the final document.
Role Name & Title Signature Date
<Project Name>
Risk Management Plan
Risk Management Plan Template 7
– Revision History
– Introduction
– Purpose
– Scope
– Roles & Responsibilities
– Procedures
– Risk Identification
– Risk Analysis
– Risk Response
– Risk Monitoring, Controlling, and Reporting
– Escalation
– Risk Contingencies
– Tools & Practices
– Risk Management Repository
– Risk Log
– References & Related Documents
– Approvals
**## CTDSSRiskManagementPlanv11week2BUSN665.pdf**
<Project Name>
Risk Management Plan
Version X.XX
Instructions to the Author:
This is a template for developing a Risk Management Plan.
The template includes instructions to the author, boilerplate text, and fields that should be replaced with the values and
information specific to the project.
Blue italicized text enclosed in boxes provide instructions to the document author, or describes the intent, assumptions, and
context for the content included in this document. This instructional text should be removed from the final document to make
the plan more readable.
Text enclosed in angle brackets (<text>) indicates a field that should be replaced with information specific to a project.
Text in black and tables are provided as boilerplate examples of wording and formats that may be used or modified as required
to support a specific project. The information and outline is a suggestion to assist in developing project documents; they are not
mandatory formats. The author should tailor the content of the document to fit the project that this work product will support.
Risk Management is the process of identifying, analyzing, and responding to risk factors throughout the life of a project and in
the best interests of its objectives. Proper risk management implies control of possible future events and is proactive rather
than reactive.
The purpose of risk management is to
• Identify possible risks
• Reduce or allocate risks
• Provide a rational basis for better decision making about all risks
• Plan
Assessing and managing risks is the best weapon against project catastrophes. By evaluating risks and the plan for potential
problems and developing strategies to address them, you’ll improve the chances of a successful, if not, perfect project.
Additionally, continuous risk management will
• Ensure high priority risks are aggressively managed and that all risks are cost-effectively managed throughout the project
• Provide management at all levels with the information required to make informed decisions on issues critical to project
success
If you don’t actively attack risks, they will actively attack your project.
DSS Project Management recommends the DSS Risk Assessment Toolkit as the starting point for developing the project risk
management plan.
Remove this page from the final document.
<Project Name>
Risk Management Plan
Risk Management Plan Template 3
Contents
Revision History ………………………………………………………………………………………………………………………….. 3
Introduction ……………………………………………………………………………………………………………………………….. 4
Purpose ………………………………………………………………………………………………………………………………….. 4
Scope ……………………………………………………………………………………………………………………………………… 4
Roles & Responsibilities ……………………………………………………………………………………………………………….. 4
Procedures …………………………………………………………………………………………………………………………………. 5
Risk Identification ……………………………………………………………………………………………………………………. 5
Risk Analysis ……………………………………………………………………………………………………………………………. 5
Risk Response ………………………………………………………………………………………………………………………….. 5
Risk Monitoring, Controlling, and Reporting ……………………………………………………………………………….. 5
Risk Contingencies …………………………………………………………………………………………………………………… 6
Tools & Practices …………………………………………………………………………………………………………………………. 6
Risk Management Repository ……………………………………………………………………………………………………. 6
Risk Log ………………………………………………………………………………………………………………………………….. 6
References & Related Documents …………………………………………………………………………………………………. 6
Approvals …………………………………………………………………………………………………………………………………… 6
Revision History
Date Version Author(s) Notes
1/1/2018 0.01
<Project Name>
Risk Management Plan
Risk Management Plan Template 4
Introduction
Provide a brief introduction to the concept of risk management for the intended audience of this document, i.e. the project team,
project sponsor, stakeholders, and executive leadership. Reference the Risk Assessment Toolkit for appropriate content.
Remove this instruction text from the final document.
Risk Management is the process of identifying, analyzing, and responding to risk throughout the life of a
project to the best interests of its objectives.
Purpose
Define the purpose of this Risk Management Plan. Provide an overview of the strategy the project team will follow to manage
risk throughout the project life cycle. Reference the Risk Assessment Toolkit for appropriate content.
Remove this instruction text from the final document.
The purpose of the Risk Management Plan is to define how risks associated with the <PROJECT NAME>
project will be identified, analyzed, and managed. The Project Manager working with the project team
and project sponsors will ensure that risks are actively identified, analyzed, and managed throughout the
life of the project.
Scope
Define the scope of this Risk Management Plan. Provide an overview of who and what will be governed by the plan. If a supplier
is part of the engagement, explain what their responsibilities will be to this plan. Reference the Risk Assessment Toolkit for
appropriate content.
Remove this instruction text from the final document.
The scope of this document pertains to the efforts to address internal and external risks specific to the
<PROJECT NAME> project. The risk management methodology identified in this document will be used
during the entire lifecycle of the project. A supplier’s risk management methodology will be provided as
a contractual deliverable. A supplier will develop a separate Risk Management Plan and will be responsible
for managing their project risks and reporting status of those risks to the Project Manager.
Roles & Responsibilities
Provide a list of personnel and their key roles and responsibilities with respect to risk management in the project.
Remove this instruction text from the final document.
The <PROJECT MANAGER OR OTHER DESIGNEE> will serve as the risk manager for this project. The risk
management roles and responsibilities of key members of the project are listed in the table below.
Name/Title Role Risk Management Responsibility
Project Director Monitors and manages risk across multiple projects
within the DSS Project Management project portfolio.
Project Sponsor Responsible for understanding risk and signing off on
all risk mitigation plans.
Project Manager Identifies project related risk, documents project
risks, leads the effort to mitigate risk, leads the effort
to communicate project risk.
Project Team Contributes to the identification of project risks.
Assist in the mitigation of risks.
<Project Name>
Risk Management Plan
Risk Management Plan Template 5
Name/Title Role Risk Management Responsibility
Risk Assessment
Lead
Identifies initial risk assessment, gathers initial
stakeholders input related to risk.
Procedures
Provide a summary of how risk management activities will be performed, recorded, and monitored throughout the lifecycle of
the project. Reference the Risk Assessment Toolkit for appropriate content.
Remove this instruction text from the final document.
Risks will be identified as early as possible in the project to minimize their impact.
Risk Identification
Explain how project risks will be identified and typed. Reference the Risk Assessment Toolkit for details on DSS Project
Management risk identification best practices.
Remove this instruction text from the final document.
Risk Analysis
Explain how risks to the project will be analyzed. Reference the Risk Assessment Toolkit for details on DSS Project Management
risk analysis best practices.
Remove this instruction text from the final document.
Risk Response
Provide a general outline of what response strategies the project will pursue should a risk escalate into an issue. Reference the
Risk Assessment Toolkit for details on DSS Project Management risk response best practices.
Remove this instruction text from the final document.
Risk Monitoring, Controlling, and Reporting
Provide a general outline of how the project team will monitor, control, and report risks. Outline standing project procedures,
review processes, frequency of reviews, and team roles and responsibilities with respect to these tasks. Include a listing of
conditions that will trigger an escalation of a risk to the appropriate level of visibility. Reference the Risk Assessment Toolkit for
details on DSS Project Management risk monitoring, controlling and reporting best practices.
Remove this instruction text from the final document.
E.g., all active high exposure risks will be tracked and published in a weekly project status report and in
the monthly executive steering committee report. When a risk has been reviewed and is found to be in a
state of escalation to a high level of exposure, it should be added to all reports.
Escalation
Provide an overview of the escalation path for reporting new high exposure risks.
Remove this instruction text from the final document.
E.g., escalation of high exposure risks should, at minimum include in the reporting chain the
• Project Sponsor
<Project Name>
Risk Management Plan
Risk Management Plan Template 6
• Business Lead
• Steering Committee
• Program Director
Risk Contingencies
Provide a listing of contingencies the project will consider with the sponsor should a response to a critical risk fail. Reference the
DSS Project Management Risk Assessment Toolkit for details on risk contingency best practices.
Remove this instruction text from the final document.
Tools & Practices
Provide an overview of the tools the project will use and the practices the team is committed to follow to manage project risks.
At a minimum, the project must develop and maintain a risk log. This can be by using a project management tool suite for large,
complex projects or using the Risk Log Template for small projects of a short duration. Additionally, the project team should
establish a repository for collocating the plan and the artifacts that will be generated over the life cycle of the project.
Remove this instruction text from the final document.
Risk Management Repository
Detail the location (directory, system, etc.) and a high-level overview of organization structure of the Risk Management
Repository. If available provide an accessible link to the repository’s location.
Remove this instruction text from the final document.
Risk Log
Provide an outline of what (i.e. DSS Risk Log Template, risk management system, etc.) will be used to capture and track identified
risks. Provide a list of the key information items that will be captured for each risk. Detail where the Risk log will be maintained.
If available, provide an accessible link to the Risk Log’s location.
Remove this instruction text from the final document.
References & Related Documents
Provide references to any project work products this plan is dependent on or are dependent on this risk management plan. For
example, the project charter contains a listing of high-level risks and assumptions, artifacts may be created from the DSS Project
Management Risk Assessment Toolkit, the project schedule will likely include risk assessment reviews at the end of every major
iteration, etc.
Remove this instruction text from the final document.
Approvals
Identify by name, title, and signature the individuals agreeing to authorize expenditure of organizational resources to
accomplish the project activities outlined in this Risk Management Plan. At a minimum, the plan should be signed by the Project
Manager, the project sponsor, and, if applicable, the executive sponsor.
Remove this instruction text from the final document.
Role Name & Title Signature Date
<Project Name>
Risk Management Plan
Risk Management Plan Template 7
– Revision History
– Introduction
– Purpose
– Scope
– Roles & Responsibilities
– Procedures
– Risk Identification
– Risk Analysis
– Risk Response
– Risk Monitoring, Controlling, and Reporting
– Escalation
– Risk Contingencies
– Tools & Practices
– Risk Management Repository
– Risk Log
– References & Related Documents
– Approvals
**## RiskManagementPlanWeek2-BUSN665B001Fall2025-APEI.pdf**
Risk Management Plan Week 2
Hide Assignment Information
Turnitin™
This assignment will be submitted to Turnitin™.
Instructions
Objectives:
LO1: The student will understand the importance of risk management planning.
LO2: The student will be able to develop a Risk Management Plan.
Instructions:
Fill in the attached template for the project described below. You have limited available
information; therefore, you can make assumptions. In the "Procedures" section, be
sure to highlight the change that will be introduced in this particular project with regard
to the playground. In the "Risk Identification" section, be sure to include a discussion
on how financial risks will be identified, then further discuss these in the subsequent
sections, as appropriate.
Project Title: Building and opening a new Toy4All store
Project Description: Toy4All toy store chain wants to open a new store in a small
town. For this project, the Director of the Projects Department assigned Mr. Play as the
project manager, an employee with five years of service in the company. He will have to
plan and coordinate all activities related to the new store's opening, which, unlike other
existing stores, will be equipped with a children's playground. He will need to consider
the activities: building the store, setting up the interior and the exterior, supplying the
store with toys, defining the personnel structure, and preparing the store for the
opening. Also, the details regarding advertising must not be forgotten. The project
duration is one year and will end with an opening event.
Due to the professionalism proven when building previous stores, the company decided
to work with the same building contractor (for the construction phase). By now, all
licenses and permits required to start the work have been obtained.
The role of Mr. Play will not be easy. He was assigned due to his idea to include a
playground in the store, which, once applied, should lead to increased sales figures.
While the entire management has supported the idea, some heads of departments in
the organization were not very pleased by his assignment, considering him too young
Due on Oct 19, 2025 11:59 PM
and inexperienced for such a project. The most serious concerns are related to the
project's impact on the already planned activities that will support sales in the holiday
season.
In the Assignment dropbox, please attach your paper as a file, do not copy &
paste.
Submit your assignment by 11:59 PM ET, Day 7.
Grading Rubric
A rubric is provided for your convenience that details how this assignment will be
graded. Please review it carefully prior to submitting your work.
**## CTDSSRiskManagementPlanv11week2BUSN665.pdf**
<Project Name>
Risk Management Plan
Version X.XX
Instructions to the Author:
This is a template for developing a Risk Management Plan.
The template includes instructions to the author, boilerplate text, and fields that should be replaced with the values and
information specific to the project.
Blue italicized text enclosed in boxes provide instructions to the document author, or describes the intent, assumptions, and
context for the content included in this document. This instructional text should be removed from the final document to make
the plan more readable.
Text enclosed in angle brackets (<text>) indicates a field that should be replaced with information specific to a project.
Text in black and tables are provided as boilerplate examples of wording and formats that may be used or modified as required
to support a specific project. The information and outline is a suggestion to assist in developing project documents; they are not
mandatory formats. The author should tailor the content of the document to fit the project that this work product will support.
Risk Management is the process of identifying, analyzing, and responding to risk factors throughout the life of a project and in
the best interests of its objectives. Proper risk management implies control of possible future events and is proactive rather
than reactive.
The purpose of risk management is to
• Identify possible risks
• Reduce or allocate risks
• Provide a rational basis for better decision making about all risks
• Plan
Assessing and managing risks is the best weapon against project catastrophes. By evaluating risks and the plan for potential
problems and developing strategies to address them, you’ll improve the chances of a successful, if not, perfect project.
Additionally, continuous risk management will
• Ensure high priority risks are aggressively managed and that all risks are cost-effectively managed throughout the project
• Provide management at all levels with the information required to make informed decisions on issues critical to project
success
If you don’t actively attack risks, they will actively attack your project.
DSS Project Management recommends the DSS Risk Assessment Toolkit as the starting point for developing the project risk
management plan.
Remove this page from the final document.
<Project Name>
Risk Management Plan
Risk Management Plan Template 3
Contents
Revision History ………………………………………………………………………………………………………………………….. 3
Introduction ……………………………………………………………………………………………………………………………….. 4
Purpose ………………………………………………………………………………………………………………………………….. 4
Scope ……………………………………………………………………………………………………………………………………… 4
Roles & Responsibilities ……………………………………………………………………………………………………………….. 4
Procedures …………………………………………………………………………………………………………………………………. 5
Risk Identification ……………………………………………………………………………………………………………………. 5
Risk Analysis ……………………………………………………………………………………………………………………………. 5
Risk Response ………………………………………………………………………………………………………………………….. 5
Risk Monitoring, Controlling, and Reporting ……………………………………………………………………………….. 5
Risk Contingencies …………………………………………………………………………………………………………………… 6
Tools & Practices …………………………………………………………………………………………………………………………. 6
Risk Management Repository ……………………………………………………………………………………………………. 6
Risk Log ………………………………………………………………………………………………………………………………….. 6
References & Related Documents …………………………………………………………………………………………………. 6
Approvals …………………………………………………………………………………………………………………………………… 6
Revision History
Date Version Author(s) Notes
1/1/2018 0.01
<Project Name>
Risk Management Plan
Risk Management Plan Template 4
Introduction
Provide a brief introduction to the concept of risk management for the intended audience of this document, i.e. the project team,
project sponsor, stakeholders, and executive leadership. Reference the Risk Assessment Toolkit for appropriate content.
Remove this instruction text from the final document.
Risk Management is the process of identifying, analyzing, and responding to risk throughout the life of a
project to the best interests of its objectives.
Purpose
Define the purpose of this Risk Management Plan. Provide an overview of the strategy the project team will follow to manage
risk throughout the project life cycle. Reference the Risk Assessment Toolkit for appropriate content.
Remove this instruction text from the final document.
The purpose of the Risk Management Plan is to define how risks associated with the <PROJECT NAME>
project will be identified, analyzed, and managed. The Project Manager working with the project team
and project sponsors will ensure that risks are actively identified, analyzed, and managed throughout the
life of the project.
Scope
Define the scope of this Risk Management Plan. Provide an overview of who and what will be governed by the plan. If a supplier
is part of the engagement, explain what their responsibilities will be to this plan. Reference the Risk Assessment Toolkit for
appropriate content.
Remove this instruction text from the final document.
The scope of this document pertains to the efforts to address internal and external risks specific to the
<PROJECT NAME> project. The risk management methodology identified in this document will be used
during the entire lifecycle of the project. A supplier’s risk management methodology will be provided as
a contractual deliverable. A supplier will develop a separate Risk Management Plan and will be responsible
for managing their project risks and reporting status of those risks to the Project Manager.
Roles & Responsibilities
Provide a list of personnel and their key roles and responsibilities with respect to risk management in the project.
Remove this instruction text from the final document.
The <PROJECT MANAGER OR OTHER DESIGNEE> will serve as the risk manager for this project. The risk
management roles and responsibilities of key members of the project are listed in the table below.
Name/Title Role Risk Management Responsibility
Project Director Monitors and manages risk across multiple projects
within the DSS Project Management project portfolio.
Project Sponsor Responsible for understanding risk and signing off on
all risk mitigation plans.
Project Manager Identifies project related risk, documents project
risks, leads the effort to mitigate risk, leads the effort
to communicate project risk.
Project Team Contributes to the identification of project risks.
Assist in the mitigation of risks.
<Project Name>
Risk Management Plan
Risk Management Plan Template 5
Name/Title Role Risk Management Responsibility
Risk Assessment
Lead
Identifies initial risk assessment, gathers initial
stakeholders input related to risk.
Procedures
Provide a summary of how risk management activities will be performed, recorded, and monitored throughout the lifecycle of
the project. Reference the Risk Assessment Toolkit for appropriate content.
Remove this instruction text from the final document.
Risks will be identified as early as possible in the project to minimize their impact.
Risk Identification
Explain how project risks will be identified and typed. Reference the Risk Assessment Toolkit for details on DSS Project
Management risk identification best practices.
Remove this instruction text from the final document.
Risk Analysis
Explain how risks to the project will be analyzed. Reference the Risk Assessment Toolkit for details on DSS Project Management
risk analysis best practices.
Remove this instruction text from the final document.
Risk Response
Provide a general outline of what response strategies the project will pursue should a risk escalate into an issue. Reference the
Risk Assessment Toolkit for details on DSS Project Management risk response best practices.
Remove this instruction text from the final document.
Risk Monitoring, Controlling, and Reporting
Provide a general outline of how the project team will monitor, control, and report risks. Outline standing project procedures,
review processes, frequency of reviews, and team roles and responsibilities with respect to these tasks. Include a listing of
conditions that will trigger an escalation of a risk to the appropriate level of visibility. Reference the Risk Assessment Toolkit for
details on DSS Project Management risk monitoring, controlling and reporting best practices.
Remove this instruction text from the final document.
E.g., all active high exposure risks will be tracked and published in a weekly project status report and in
the monthly executive steering committee report. When a risk has been reviewed and is found to be in a
state of escalation to a high level of exposure, it should be added to all reports.
Escalation
Provide an overview of the escalation path for reporting new high exposure risks.
Remove this instruction text from the final document.
E.g., escalation of high exposure risks should, at minimum include in the reporting chain the
• Project Sponsor
<Project Name>
Risk Management Plan
Risk Management Plan Template 6
• Business Lead
• Steering Committee
• Program Director
Risk Contingencies
Provide a listing of contingencies the project will consider with the sponsor should a response to a critical risk fail. Reference the
DSS Project Management Risk Assessment Toolkit for details on risk contingency best practices.
Remove this instruction text from the final document.
Tools & Practices
Provide an overview of the tools the project will use and the practices the team is committed to follow to manage project risks.
At a minimum, the project must develop and maintain a risk log. This can be by using a project management tool suite for large,
complex projects or using the Risk Log Template for small projects of a short duration. Additionally, the project team should
establish a repository for collocating the plan and the artifacts that will be generated over the life cycle of the project.
Remove this instruction text from the final document.
Risk Management Repository
Detail the location (directory, system, etc.) and a high-level overview of organization structure of the Risk Management
Repository. If available provide an accessible link to the repository’s location.
Remove this instruction text from the final document.
Risk Log
Provide an outline of what (i.e. DSS Risk Log Template, risk management system, etc.) will be used to capture and track identified
risks. Provide a list of the key information items that will be captured for each risk. Detail where the Risk log will be maintained.
If available, provide an accessible link to the Risk Log’s location.
Remove this instruction text from the final document.
References & Related Documents
Provide references to any project work products this plan is dependent on or are dependent on this risk management plan. For
example, the project charter contains a listing of high-level risks and assumptions, artifacts may be created from the DSS Project
Management Risk Assessment Toolkit, the project schedule will likely include risk assessment reviews at the end of every major
iteration, etc.
Remove this instruction text from the final document.
Approvals
Identify by name, title, and signature the individuals agreeing to authorize expenditure of organizational resources to
accomplish the project activities outlined in this Risk Management Plan. At a minimum, the plan should be signed by the Project
Manager, the project sponsor, and, if applicable, the executive sponsor.
Remove this instruction text from the final document.
Role Name & Title Signature Date
<Project Name>
Risk Management Plan
Risk Management Plan Template 7
– Revision History
– Introduction
– Purpose
– Scope
– Roles & Responsibilities
– Procedures
– Risk Identification
– Risk Analysis
– Risk Response
– Risk Monitoring, Controlling, and Reporting
– Escalation
– Risk Contingencies
– Tools & Practices
– Risk Management Repository
– Risk Log
– References & Related Documents
– Approvals
**## RiskManagementPlanWeek2-BUSN665B001Fall2025-APEI.pdf**
Risk Management Plan Week 2
Hide Assignment Information
Turnitin™
This assignment will be submitted to Turnitin™.
Instructions
Objectives:
LO1: The student will understand the importance of risk management planning.
LO2: The student will be able to develop a Risk Management Plan.
Instructions:
Fill in the attached template for the project described below. You have limited available
information; therefore, you can make assumptions. In the "Procedures" section, be
sure to highlight the change that will be introduced in this particular project with regard
to the playground. In the "Risk Identification" section, be sure to include a discussion
on how financial risks will be identified, then further discuss these in the subsequent
sections, as appropriate.
Project Title: Building and opening a new Toy4All store
Project Description: Toy4All toy store chain wants to open a new store in a small
town. For this project, the Director of the Projects Department assigned Mr. Play as the
project manager, an employee with five years of service in the company. He will have to
plan and coordinate all activities related to the new store's opening, which, unlike other
existing stores, will be equipped with a children's playground. He will need to consider
the activities: building the store, setting up the interior and the exterior, supplying the
store with toys, defining the personnel structure, and preparing the store for the
opening. Also, the details regarding advertising must not be forgotten. The project
duration is one year and will end with an opening event.
Due to the professionalism proven when building previous stores, the company decided
to work with the same building contractor (for the construction phase). By now, all
licenses and permits required to start the work have been obtained.
The role of Mr. Play will not be easy. He was assigned due to his idea to include a
playground in the store, which, once applied, should lead to increased sales figures.
While the entire management has supported the idea, some heads of departments in
the organization were not very pleased by his assignment, considering him too young
Due on Oct 19, 2025 11:59 PM
and inexperienced for such a project. The most serious concerns are related to the
project's impact on the already planned activities that will support sales in the holiday
season.
In the Assignment dropbox, please attach your paper as a file, do not copy &
paste.
Submit your assignment by 11:59 PM ET, Day 7.
Grading Rubric
A rubric is provided for your convenience that details how this assignment will be
graded. Please review it carefully prior to submitting your work.
**## CTDSSRiskManagementPlanv11week2BUSN665.pdf**
<Project Name>
Risk Management Plan
Version X.XX
Instructions to the Author:
This is a template for developing a Risk Management Plan.
The template includes instructions to the author, boilerplate text, and fields that should be replaced with the values and
information specific to the project.
Blue italicized text enclosed in boxes provide instructions to the document author, or describes the intent, assumptions, and
context for the content included in this document. This instructional text should be removed from the final document to make
the plan more readable.
Text enclosed in angle brackets (<text>) indicates a field that should be replaced with information specific to a project.
Text in black and tables are provided as boilerplate examples of wording and formats that may be used or modified as required
to support a specific project. The information and outline is a suggestion to assist in developing project documents; they are not
mandatory formats. The author should tailor the content of the document to fit the project that this work product will support.
Risk Management is the process of identifying, analyzing, and responding to risk factors throughout the life of a project and in
the best interests of its objectives. Proper risk management implies control of possible future events and is proactive rather
than reactive.
The purpose of risk management is to
• Identify possible risks
• Reduce or allocate risks
• Provide a rational basis for better decision making about all risks
• Plan
Assessing and managing risks is the best weapon against project catastrophes. By evaluating risks and the plan for potential
problems and developing strategies to address them, you’ll improve the chances of a successful, if not, perfect project.
Additionally, continuous risk management will
• Ensure high priority risks are aggressively managed and that all risks are cost-effectively managed throughout the project
• Provide management at all levels with the information required to make informed decisions on issues critical to project
success
If you don’t actively attack risks, they will actively attack your project.
DSS Project Management recommends the DSS Risk Assessment Toolkit as the starting point for developing the project risk
management plan.
Remove this page from the final document.
<Project Name>
Risk Management Plan
Risk Management Plan Template 3
Contents
Revision History ………………………………………………………………………………………………………………………….. 3
Introduction ……………………………………………………………………………………………………………………………….. 4
Purpose ………………………………………………………………………………………………………………………………….. 4
Scope ……………………………………………………………………………………………………………………………………… 4
Roles & Responsibilities ……………………………………………………………………………………………………………….. 4
Procedures …………………………………………………………………………………………………………………………………. 5
Risk Identification ……………………………………………………………………………………………………………………. 5
Risk Analysis ……………………………………………………………………………………………………………………………. 5
Risk Response ………………………………………………………………………………………………………………………….. 5
Risk Monitoring, Controlling, and Reporting ……………………………………………………………………………….. 5
Risk Contingencies …………………………………………………………………………………………………………………… 6
Tools & Practices …………………………………………………………………………………………………………………………. 6
Risk Management Repository ……………………………………………………………………………………………………. 6
Risk Log ………………………………………………………………………………………………………………………………….. 6
References & Related Documents …………………………………………………………………………………………………. 6
Approvals …………………………………………………………………………………………………………………………………… 6
Revision History
Date Version Author(s) Notes
1/1/2018 0.01
<Project Name>
Risk Management Plan
Risk Management Plan Template 4
Introduction
Provide a brief introduction to the concept of risk management for the intended audience of this document, i.e. the project team,
project sponsor, stakeholders, and executive leadership. Reference the Risk Assessment Toolkit for appropriate content.
Remove this instruction text from the final document.
Risk Management is the process of identifying, analyzing, and responding to risk throughout the life of a
project to the best interests of its objectives.
Purpose
Define the purpose of this Risk Management Plan. Provide an overview of the strategy the project team will follow to manage
risk throughout the project life cycle. Reference the Risk Assessment Toolkit for appropriate content.
Remove this instruction text from the final document.
The purpose of the Risk Management Plan is to define how risks associated with the <PROJECT NAME>
project will be identified, analyzed, and managed. The Project Manager working with the project team
and project sponsors will ensure that risks are actively identified, analyzed, and managed throughout the
life of the project.
Scope
Define the scope of this Risk Management Plan. Provide an overview of who and what will be governed by the plan. If a supplier
is part of the engagement, explain what their responsibilities will be to this plan. Reference the Risk Assessment Toolkit for
appropriate content.
Remove this instruction text from the final document.
The scope of this document pertains to the efforts to address internal and external risks specific to the
<PROJECT NAME> project. The risk management methodology identified in this document will be used
during the entire lifecycle of the project. A supplier’s risk management methodology will be provided as
a contractual deliverable. A supplier will develop a separate Risk Management Plan and will be responsible
for managing their project risks and reporting status of those risks to the Project Manager.
Roles & Responsibilities
Provide a list of personnel and their key roles and responsibilities with respect to risk management in the project.
Remove this instruction text from the final document.
The <PROJECT MANAGER OR OTHER DESIGNEE> will serve as the risk manager for this project. The risk
management roles and responsibilities of key members of the project are listed in the table below.
Name/Title Role Risk Management Responsibility
Project Director Monitors and manages risk across multiple projects
within the DSS Project Management project portfolio.
Project Sponsor Responsible for understanding risk and signing off on
all risk mitigation plans.
Project Manager Identifies project related risk, documents project
risks, leads the effort to mitigate risk, leads the effort
to communicate project risk.
Project Team Contributes to the identification of project risks.
Assist in the mitigation of risks.
<Project Name>
Risk Management Plan
Risk Management Plan Template 5
Name/Title Role Risk Management Responsibility
Risk Assessment
Lead
Identifies initial risk assessment, gathers initial
stakeholders input related to risk.
Procedures
Provide a summary of how risk management activities will be performed, recorded, and monitored throughout the lifecycle of
the project. Reference the Risk Assessment Toolkit for appropriate content.
Remove this instruction text from the final document.
Risks will be identified as early as possible in the project to minimize their impact.
Risk Identification
Explain how project risks will be identified and typed. Reference the Risk Assessment Toolkit for details on DSS Project
Management risk identification best practices.
Remove this instruction text from the final document.
Risk Analysis
Explain how risks to the project will be analyzed. Reference the Risk Assessment Toolkit for details on DSS Project Management
risk analysis best practices.
Remove this instruction text from the final document.
Risk Response
Provide a general outline of what response strategies the project will pursue should a risk escalate into an issue. Reference the
Risk Assessment Toolkit for details on DSS Project Management risk response best practices.
Remove this instruction text from the final document.
Risk Monitoring, Controlling, and Reporting
Provide a general outline of how the project team will monitor, control, and report risks. Outline standing project procedures,
review processes, frequency of reviews, and team roles and responsibilities with respect to these tasks. Include a listing of
conditions that will trigger an escalation of a risk to the appropriate level of visibility. Reference the Risk Assessment Toolkit for
details on DSS Project Management risk monitoring, controlling and reporting best practices.
Remove this instruction text from the final document.
E.g., all active high exposure risks will be tracked and published in a weekly project status report and in
the monthly executive steering committee report. When a risk has been reviewed and is found to be in a
state of escalation to a high level of exposure, it should be added to all reports.
Escalation
Provide an overview of the escalation path for reporting new high exposure risks.
Remove this instruction text from the final document.
E.g., escalation of high exposure risks should, at minimum include in the reporting chain the
• Project Sponsor
<Project Name>
Risk Management Plan
Risk Management Plan Template 6
• Business Lead
• Steering Committee
• Program Director
Risk Contingencies
Provide a listing of contingencies the project will consider with the sponsor should a response to a critical risk fail. Reference the
DSS Project Management Risk Assessment Toolkit for details on risk contingency best practices.
Remove this instruction text from the final document.
Tools & Practices
Provide an overview of the tools the project will use and the practices the team is committed to follow to manage project risks.
At a minimum, the project must develop and maintain a risk log. This can be by using a project management tool suite for large,
complex projects or using the Risk Log Template for small projects of a short duration. Additionally, the project team should
establish a repository for collocating the plan and the artifacts that will be generated over the life cycle of the project.
Remove this instruction text from the final document.
Risk Management Repository
Detail the location (directory, system, etc.) and a high-level overview of organization structure of the Risk Management
Repository. If available provide an accessible link to the repository’s location.
Remove this instruction text from the final document.
Risk Log
Provide an outline of what (i.e. DSS Risk Log Template, risk management system, etc.) will be used to capture and track identified
risks. Provide a list of the key information items that will be captured for each risk. Detail where the Risk log will be maintained.
If available, provide an accessible link to the Risk Log’s location.
Remove this instruction text from the final document.
References & Related Documents
Provide references to any project work products this plan is dependent on or are dependent on this risk management plan. For
example, the project charter contains a listing of high-level risks and assumptions, artifacts may be created from the DSS Project
Management Risk Assessment Toolkit, the project schedule will likely include risk assessment reviews at the end of every major
iteration, etc.
Remove this instruction text from the final document.
Approvals
Identify by name, title, and signature the individuals agreeing to authorize expenditure of organizational resources to
accomplish the project activities outlined in this Risk Management Plan. At a minimum, the plan should be signed by the Project
Manager, the project sponsor, and, if applicable, the executive sponsor.
Remove this instruction text from the final document.
Role Name & Title Signature Date
<Project Name>
Risk Management Plan
Risk Management Plan Template 7
– Revision History
– Introduction
– Purpose
– Scope
– Roles & Responsibilities
– Procedures
– Risk Identification
– Risk Analysis
– Risk Response
– Risk Monitoring, Controlling, and Reporting
– Escalation
– Risk Contingencies
– Tools & Practices
– Risk Management Repository
– Risk Log
– References & Related Documents
– Approvals
– 1
– 2